当前位置:INFORMATION
Pay attention to the activities of the board of fire safety
2015年06月26日

With the development of the city, the city in the construction site can be seen everywhere. Construction sites, the activities of the board is construction workers temporary residential building construction, easy to use at the same time, these buildings also exist certain fire risk and need to cause our attention.
Prefabricated house
Activities of the board of the main building materials color steel plate has the advantages of light weight, high strength, installation is convenient wait for a characteristic, which is widely used in the earthquake stricken houses, factories, warehouses, shops, kiosks and the engineering construction site temporary space. Due to the use of color steel plate core material with polystyrene, polyurethane foam and other flammable materials, after the fire spread quickly, the combustion product is toxic, very easy to cause significant property damage and casualties.
The activities of the board of fire safety please pay attention to the following five aspects:
1, in the design of color steel plate construction, to strictly implement the "building design fire code", "construction site fire safety technical specifications" and other national standards requirements. New construction, expansion, renovation use color steel factories, warehouses, shops and other construction projects and used as a temporary construction personnel intensive places, to follow the implementation of the construction project fire supervision and management regulations "requirements, from the source to enhance color steel building fire safety management.
2, earnestly implement the fire safety responsibility system, strengthen the user's fire safety awareness, do a good job of fire safety training, improve the protection consciousness.
3, to strengthen the activities of the board of the daily fire safety management, board banned use high power appliances. When leaving the room timely broken more power; prohibit the use of fire in the room, banned the activities of the board as a kitchen, power distribution room, flammable and explosive goods warehouse use.
4, laying electrical lines must conform to the requirements of the specification, all the wires should be Ming Fu, and set the flame tube, lighting fixtures and walls should keep a safe distance, lighting lamps should use electronic ballast type, cannot use the coil inductance type ballast, party lines through the color steel sandwich panel walls must set with a burning plastic pipe, each building on the board to qualified installation of leakage protection device with overload and short circuit switch.
5, when the board as a dormitory, doors and windows should be opened outward, bed placed should not be too dense to allow safe passage; equipped with a sufficient number of fire extinguishers, installation of indoor fire hydrant, and to ensure that the water flow and pressure to meet the relevant requirements